DRYDOCK 2 |
|
(where she was originally built) in San Pedro, CA, on 17 Nov 1969. During this extensive yard period, most aspects of the engineering plant received a major overhauling,the two large cranes were completely redone, an entire new communications center was installed,repairs performed on the hull, and much of the exterior of the ship was sandblasted & re-painted. On 20 March 1970, Hector successfully completed a day of sea trials. |
.
Photos by Jim Barcus (ET2)